ActiveBatch → Control-M
Migrating to Control-M from ActiveBatch.
Concept-by-concept
What changes, what stays the same.
Three paths, one destination
Engagement shaped to your team. Methodology comes from BMC.
- Advisory. Your team leads. We coach your conversion-rule design in the Control-M Self Conversion Tool, review outputs, and stay close through validation and cutover.
- Blended — where most engagements run. Your team owns the parts where you want to stay close. Our ActiveBatch-experienced team owns the parts where deep Control-M expertise pays off. The line moves as the project moves.
- Comprehensive. We run the conversion end to end using the Control-M Conversion Tool, while your team stays focused on day-to-day operations.
What the assessment looks like
Sample WayPoint output.
- Illustrative output · ActiveBatch → Control-M
-
Source ActiveBatch 12.x
-
Target Control-M (current GA)
-
Jobs inventoried 3,640
-
Plans / Containers 214
-
Application owners mapped 12
-
Date Schemes 28 (25 standard / 3 edge)
-
Service Library entries 62 (18 custom review)
-
Inline scripts (PowerShell) 142 (case-by-case)
-
Constraints — resource maps 48
-
Constraints — queue caps 30
What drives the work
Scope and timeline are confirmed in the assessment.
Frequently asked
ActiveBatch → Control-M questions.
How does Control-M handle ActiveBatch’s job-step model?
ActiveBatch’s job-step composition — multiple steps inside a single Job — flattens into a linked set of Jobs within a Control-M Folder. The execution semantics are preserved. The artifact count grows, but each artifact is more granular and easier to monitor.
What happens to our inline PowerShell or .NET scripts?
They get reviewed individually in the assessment phase. Most can be lifted-and-shifted into Control-M Application Plug-ins or as Auto-Edit Variable-driven submissions. A small percentage need rework — usually because the script is doing work that fits better as a Control-M-native pattern.
Can we keep our audit-trail continuity for compliance?
Yes. Control-M Workload Archiving has equivalent retention and query capability. Audit-trail mapping is part of the assessment phase and is signed off by the compliance owner before cutover.